The scope
As part of the Gas Road Bridge improvement works, Freyssinet was engaged by Cheshire Highways as Principal Contractor to replace the existing failed rail joint on a like for like basis. However, given the joint’s heavy traffic loading, Freyssinet undertook a technical review and recommended an alternative, more durable solution. Instead of reinstating the same joint type, Freyssinet proposed upgrading to the Freyssinet WRB expansion joint, highlighting its long-term performance advantages, improved durability, and enhanced movement capacity.