Completed Contracts

A20 Folkestone Viaduct

  - Download PDF Download PDF

Glued segmental box with internal post-tensioning


A3/A31 Overbridge at Guildford

  - Download PDF Download PDF

Strengthening by replacing the existing external tendons


A6 Beaune Reconfiguration

  - Download PDF Download PDF

The reconfiguration of a 4 span bridge into a 2 span cable stay bridge provides an elegant and economic solution to a typical road widening design dilemma


Auchtertyre Viaduct, Scotland

  - Download PDF Download PDF

Stressing scheme tailored to fit in with existing attributes of the viaduct


Cardiff Millennium Stadium

  - Download PDF Download PDF

Freyssinet were contracted to design and install the stay cable system supporting the stadium roof


Cement Silo, Stamford

  - Download PDF Download PDF

Construction of two prestressed concrete silos.


Flintshire Bridge

  - Download PDF Download PDF

Installation of Stay Cables and Prestressing of the Main Structure and the Approach Viaducts


M5 Avonmouth Viaduct

  - Download PDF Download PDF

Strengthening the main river crossing by adding prestressing tendons


Poplar High Level Walkway

  - Download PDF Download PDF

Cable Stayed Footbridge at Poplar in London Docklands


Sakhalin LNG Plant, Sakhalin Island, R

  - Download PDF Download PDF

The LNG plant is located on the Pacific coast of Sakhalin Island, Russia which is a cold climate with daily temperatures at sub zero level from November to March enabling the site to operate from April to December only.


Second Severn Crossing

  - Download PDF Download PDF

The crossing, 5,125 m long, consists of a cable-stayed bridge – central span 456 m long – and two access viaducts